🥝GuideKiwi
Free Guide

Learn How to Attach Rolled Roofing Yourself

Understanding Rolled Roofing Basics and When to Use It Rolled roofing is a practical roofing material commonly used on low-slope or flat roofs where traditio...

GuideKiwi Editorial Team·

Understanding Rolled Roofing Basics and When to Use It

Rolled roofing is a practical roofing material commonly used on low-slope or flat roofs where traditional asphalt shingles don't work well. The material comes in large rolls that typically measure 36 inches wide and contain enough material to cover about 100 square feet when installed correctly. Each roll weighs between 50 to 80 pounds depending on the grade and thickness, so planning for proper handling is important before starting your project.

This roofing type consists of a fiberglass or organic felt base saturated with asphalt and covered with a mineral granule surface. The granules serve multiple purposes—they protect the asphalt from ultraviolet rays, provide fire resistance, and give the roof a finished appearance. Rolled roofing typically lasts between 5 to 10 years, depending on climate conditions, installation quality, and maintenance frequency. In areas with extreme temperature swings or intense sun exposure, the lifespan may be shorter.

Rolled roofing works best on roofs with a slope of 2:12 or less, meaning the roof rises only 2 inches for every 12 inches it travels horizontally. Steeper roofs require shingles because rolled roofing can slide down or allow water to pool beneath seams. Common applications include storage sheds, garages, carports, mobile homes, and commercial flat-roof structures. Before purchasing materials, measure your roof dimensions carefully by multiplying length times width, then add 10 percent to account for overlaps and waste during installation.

Practical takeaway: Measure your roof area accurately and verify that your roof slope is 2:12 or less. Calculate the total square footage and order rolls accordingly, keeping extra materials for repairs and mistakes.

Gathering Tools, Materials, and Safety Equipment

Before beginning any roofing project, collect all necessary tools and materials to avoid multiple trips to the supply store. The basic tool list includes a utility knife with sharp blades, a 24-inch straightedge or metal ruler, a tape measure, a roofing hammer or pneumatic nailer with roofing nails, a broom or brush, a caulking gun for roofing cement, and a ladder that extends at least 3 feet above your roof line. A chalk line helps mark straight installation lines, and a hammer stapler can be used as an alternative fastening method. Having a work apron or tool belt keeps frequently used items within reach during installation.

Material requirements vary by roof size, but a typical 100-square-foot project needs one roll of roofing material, one bucket of roofing cement or adhesive, roofing nails (typically 1.25 inches long), and possibly flashing for roof edges and penetrations. Some installers prefer using self-adhesive rolled roofing, which eliminates the need for roofing cement and reduces application complexity. Standard rolled roofing requires more frequent nailing and cement application but may cost slightly less than self-adhesive versions.

Safety equipment is mandatory for any roof work. Wear work boots with good traction to prevent slipping on sloped or curved surfaces. A safety harness is highly recommended when working on any roof higher than 6 feet, and it is required by occupational safety regulations in many jurisdictions. Wear work gloves to protect hands from sharp edges and rough surfaces. Long pants and a long-sleeved shirt protect skin from asphalt adhesive and sun exposure. On hot days, wear light colors that reflect heat, and take frequent water breaks to prevent heat exhaustion. Eye protection keeps dust and debris away from eyes, particularly when cutting material with a utility knife.

Practical takeaway: Create a complete tools and materials checklist before beginning work, including safety items. Verify that all equipment functions properly and that you have extra blades, nails, and fasteners on hand.

Preparing Your Roof Surface for Installation

Proper roof preparation determines how well your rolled roofing will perform over its lifespan. Start by removing any existing roofing material, debris, loose nails, or damaged wood. This process is called stripping or tearing off old roofing. Use a shovel or pry bar to lift and remove the old material, placing it in a dumpster or appropriate waste container. Some areas require hiring a professional waste removal service for roofing debris, so check local regulations before disposing of materials yourself.

After removing old roofing, inspect the underlying roof deck—typically plywood or wood sheathing—for damage. Press on the surface with your foot or hand to detect soft spots that indicate rot or moisture damage. Soft areas require replacement before new roofing installation. Use a circular saw to cut out damaged sections and screw or nail new plywood patches in place, matching the thickness of surrounding material. Ensure all patches are flush with surrounding surfaces to prevent bumps or uneven spots that create water pooling.

Clean the entire roof surface thoroughly with a broom or air compressor to remove all dirt, dust, and debris. Any particles left on the surface can interfere with adhesive bonding and create weak spots. Check for and remove any remaining nails, metal flashing, or debris that could puncture the new roofing material. Fill any small holes or gaps in the roof deck with roofing cement or patching compound. In cooler climates, consider applying a primer or base sheet if the existing surface is particularly porous or uneven.

Inspect roof edges, valleys, and any penetrations like vent pipes or chimneys. These areas require flashing or additional material to prevent water infiltration. Make note of all edges and penetrations so you can plan your roofing layout to accommodate them. Check gutters and drainage systems to ensure water flows away from the roof structure properly.

Practical takeaway: Spend time on thorough surface preparation—it takes longer than installation but prevents future leaks and extends roof lifespan. A well-prepared deck with no soft spots or debris is essential for roofing success.

Measuring, Cutting, and Positioning Rolled Roofing Material

Accurate measurement and positioning prevent waste and ensure proper water drainage. Start at the lowest point of your roof and work toward the highest point. Water should flow downward over each layer of roofing material, similar to shingle installation. On a rectangular roof, begin installation at the long edge parallel to your roof's length.

Unroll your first piece of roofing material and position it along the eave or low edge, leaving a 6-inch overhang beyond the roof edge if desired. Some installers prefer a 2-inch overhang, while others set the material flush with the edge. An overhang helps protect the edge of your roof deck from water exposure. Use chalk lines to mark where each roll should be positioned before fastening. This prevents crooked lines and ensures uniform appearance across your roof.

Cutting rolled roofing requires a sharp utility knife and a straightedge. Place the straightedge where you want to cut and draw the knife blade along the edge using firm, steady pressure. Make multiple passes if needed rather than trying to cut through in one pass—this prevents blade binding and gives cleaner cuts. Replace dull blades frequently because dull blades tear material rather than cutting cleanly, creating weak spots and wasted material. When cutting around obstacles like vents or chimneys, measure carefully and mark cut lines with chalk before cutting.

For selvage-edge installation (the most common method), the first roll overlaps the eave edge. The second roll overlaps the first roll by 4 inches along the length and 6 inches on the sides. This overlap pattern continues across your entire roof. The overlapping sections are where fastening and adhesive are applied to create the watertight seal. Some rolled roofing products have a selvage edge (an uncoated strip) that must remain visible; this edge is where fasteners are placed and adhesive is applied.

Practical takeaway: Work from the lowest roof point upward, ensuring each piece overlaps correctly. Use chalk lines for straight placement and keep measurements consistent across the entire roof.

Fastening and Adhering Rolled Roofing to Your Roof

Fastening rolled roofing involves combining mechanical fasteners (nails or staples) with adhesive for maximum holding power. Begin with your first roll positioned at the lowest edge of the roof. For traditional rolled roofing, apply roofing cement or adhesive to the selvage edge area before fastening. Use a putty knife or

🥝

More guides on the way

Browse our full collection of free guides on topics that matter.

Browse All Guides →